Overhead Optical Fiber Cables laying can exist between buildings, between buildings and telephone poles, and between poles and poles. The actual operation depends on the situation at the time. When there are telegraph poles between buildings, a steel wire rope can be erected between the building and the telegraph pole, and the optical cable can be tied to the wire rope; if there are no telegraph poles between the buildings, but the distance between the two buildings is about 50m, Optical cables can also be installed directly between buildings through steel cables. The laying requirements are as follows:

 

What Are The Requirements For Laying Overhead Optical Fiber Cables?

 

1. When laying optical cables in a flat environment using overhead methods, use hooks for hanging; when laying optical cables in mountains or steep slopes, use binding methods to lay optical cables. Optical cable joints should be positioned on straight poles that are easy to maintain, and the reserved optical cables should be fixed on the poles with reserved brackets.


2. The optical cable in the overhead pole path is required to make U-shaped telescopic bends every 3-5 poles, and approximately 15m is reserved for every 1km.

 

3. The overhead (wall) optical cables should be protected with galvanized steel pipes, and the pipe openings should be blocked with fireproof mud.

4. Optical cable warning signs should be hung on overhead optical cables every four stops and in special areas such as across roads, rivers, and bridges.

 

5. The intersection of the hanging wire and the power line should be protected by a three-prong protective tube, and the extension of each end should not be less than 1m.

 

6. The electric pole cables close to the road should be wrapped with light rods, with a length of 2m.

 

7. In order to prevent the electric current induced by the hanging wire from injuring people, each pole wire is required to be electrically connected to the hanging wire. Each pulling wire position should be installed with a pull-type ground wire. The hanging wire is required to be directly connected with a bushing ring and directly grounded at the terminal.

 

8. Aerial optical cables are usually 3m above the ground. When entering a building, they must pass through the U-shaped steel protective sheath on the exterior wall of the building, and then extend downward or upward. The aperture of the optical cable entrance is generally 5cm.

 

What Are The Requirements For Laying Overhead Optical Fiber Cables?

Related Products
Related Articles
inquiry_image_src
Let's Start A New Project Today
We will help you to

Save money - with manufacturer direct pricing

 Save time - with experienced team to get project done

 Lead the industry - with the most cutting-edge products